Jason is a project manager, He is dividing up work for his team. He gave Sarah 1/27th of the job, Brandon 0.32 of the job and Kelly 21% of the job. Jason will do the rest of the job himself. Including himself, who worked most of the job? Show all your work.

Answer :

Answer:

Jason did the most, at about 43.3%

Step-by-step explanation:

Sarah did 1/27th of the work, which is about 0.037

Brandon did 0.32

Kelly did 21%, which is 0.21

Jason did the rest, which is 1-0.037-0.32-0.21=0.433